
How to Order
The questions buyers ask before a first order, answered in one place: minimum order, samples, lead times, payment, packing and export. These are the terms we work to today. Anything specific to your project is confirmed on the quote.
The sequence
Two of the seven steps wait on you: the brief and the approval. A finished sample usually takes 7 days; a complex piece can take longer, and we tell you when we quote.
A drawing, a sketch or a reference photo, with quantity, fabric if you know it, and the delivery country.
Line-by-line pricing, and the design redrawn for your approval.
Free fabric swatches; a finished sample if you want to judge the piece in the hand.
You sign off the design and fabric; a 50% deposit starts production. Hotel projects: no deposit.
Frames welded and coated, cloth cut, wrapped and bonded by hand.
Every piece is lit and checked, then packed in five-layer cartons with PE foam.
The balance is paid before delivery; goods pass to our export partner or your forwarder.
A real order, from the paperwork
Yakult Vietnam asked for printed fabric lamps in the shape of its bottle, 30 cm in diameter, in three colourways. We made one sample first, so the shape and print colour could be approved before anything else was built. A first batch of 17 followed, and the client reordered 10 a month later. Each batch took 8–12 days.
The dates and quantities come from the invoices and contracts for the order. More records like this are on our projects page.
These apply only to deliveries within Vietnam.
Quote from a SKU
A catalogue SKU is the fastest route to a quote: the frame and pattern are already made. Every card shows its indicative ex-works price.








Indicative unit price, ex-works Ho Chi Minh City. Excludes freight, insurance and duties. Volume pricing confirmed on quotation.
Catalogue 2026–2027 · November 2026
29 pages. Projects already lit, the collection, fabrics and frame colours, and our process, trade terms and prices. No form to fill in; open it online or download the PDF.
Questions
Fifty pieces per export order. Within Vietnam, catalogue pieces can be ordered singly and custom designs usually start at ten.
Fabric swatches are always free. A finished sample is charged at its value, which depends on the design, and is free for hotel projects. It usually takes 7 days to make. For a small sample ahead of a confirmed order we may waive the charge; the quote will tell you.
Seven to ten days for 1–100 pieces and ten to fifteen days above 100, counted from approval of the design and fabric. Rush orders are possible from three working days with a 10–20% surcharge. Freight time is separate.
A 50% deposit when the design is approved and the remaining 50% before delivery. Hotel projects need no deposit. Established trade accounts may agree credit terms of up to 30 days.
Yes. Orders abroad go through our export partner, who handles all the export paperwork, or we hand over to your own freight forwarder. Prices are ex-works Ho Chi Minh City; freight, insurance and import duties are not included.
We do not claim CE, UL or similar certification, and our fabrics are not treated to be fire-retardant. If your specification requires either, raise it when you ask for a quote and we will tell you plainly what we can and cannot supply.
Yes. We make pieces under your logo or label for resale under your own name, and we sign a non-disclosure agreement on request.
Ordering for hotels? See hospitality lighting. Buying to resell? See wholesale and trade. Working from your own drawing? See custom lampshades.